Coils for commercial and institutional spaces.

Custom commercial coils for the equipment serving workplaces and public buildings. Made to order for replacement, retrofit, and new applications.

Choose your property type.

Office buildings — Selected

Spaces throughout your office building.

Work areas, boardrooms, and employee cafés support different activities throughout the day. For work on the commercial equipment serving these spaces, we can help you review coil dimensions, connections, and project timing.

Workspaces and collaboration areas

Individual work areas and shared booths bring different uses together across an office floor. Identify the unit serving the area and share the existing coil dimensions, connection locations, and available operating information. Include maintenance access and the planned installation window to help coordinate work around the workplace.

Office work booths with warm oak surrounds, solid taupe upholstered seating, white tables, and continuous neutral gray flooring.

Boardrooms and meeting spaces

Meeting rooms experience changing occupancy throughout the day. Share the equipment details, coil measurements, connections, and any specified operating or air-pressure-drop requirements. Include room schedules and access restrictions when planning replacement work.

Daylit office boardroom with a long wood conference table, gray mesh chairs, large pendant lights, and windows overlooking neighboring office buildings.

Employee cafés and break areas

Shared refreshment areas support staff throughout the working day. Identify the HVAC equipment serving the room and provide the coil dimensions, connections, and operating information. Describe any separate kitchen or make-up air equipment so its requirements can be reviewed independently.

Employee café with warm wood cabinetry, a stainless refrigerator, two pale counters with geometric fronts, four white stools, and rounded pendant lights.

Built with quality in mind.

Good quality starts with attention to the details. From material selection to manufacturing processes, the focus is on coils built to your approved specifications for the equipment serving your building.

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • AHRI CERTIFIED
  • CE marking

Manufacturing certifications and product conformity.

Start with what you have.

Follow our measurement guides, enter measurements you already have, or upload drawings or specifications. You can add photos to help explain the details.

  • Help me measure my coil

    Interactive guides, one measurement at a time

  • I already have my measurements

    Enter everything on one measurement sheet

  • I have drawings or specifications

    Upload your documents for engineering review

Production lead times

Microchannel coils
15–21 calendar days
All other coils
12–15 calendar days

After drawing approval. Shipping time is additional.

Need coils for your office building?

Tell us about the equipment and spaces you’re working on. We’ll help you with the next step.

Start a Coil Brief